Proposed Gravel Quarry

  • Proposed Gravel Quarry

This proposed decomposed granite quarry was within the Sydney Catchment and required a water cycle management study to demonstrate that the water quality would not be affected by the proposed development. The study needed to demonstrate how the site could be sequentially developed and contain the run off within the quarry pit and how the completed excavated site would be rehabilitated at the end of the quarry’s ilfe.

Category: Erosion and Sediment Control

Share: