This required an on-site wastewater system incorporating a system design. The proposed irrigation system had already been identified at sub-division stage with an 88B that pre-determined the method and location of wastewater disposal.
Sub-surface irrigation is shown in the image.
Location: Sydney
Area: 1146m
Category: On-site Wastewater Management