This proposed secondary dwelling on a property within the Sydney Water Catchment required an on-site wastewater management system that would suit it’s intermittent use as it was being developed as guest accommodation. Sydney Catchment Authority guidelines prevent the use of aerated systems to be used for intermittent use and for this reason an independent wastewater treatment system using a septic tank and soil absorption bed was proposed.
Location: Sydney
Area: 740m
Category: On-site Wastewater Management