
Contact Harris Environmental Consulting for your on-site wastewater, stormwater, erosion & sediment control or bushfire assessment needs.
“Cost-effective water cycle solutions that protect Wollondilly’s waterways and support smooth council approvals.”
Effectively managing water resources is integral to furthering the overall development of Wollondilly Shire through responsible management practices. Comprehensive water cycle planning is necessary to effectively protect natural resources (e.g., lakes, rivers and streams) while also promoting the development of Wollondilly's economy. Wollondilly Shire has vast rural land, diverse topographical features, significant waterways, and environmentally sensitive areas. Therefore, the protection and sustainable management of local water resources are essential for the completion of future development projects.
For more than 20 years, Harris Environmental Consulting has conducted a variety of environmental investigations, including conducting numerous water cycle management studies in Wollondilly. In this time, Harris has gained a deep understanding of the unique challenges associated with water cycle management and has completed numerous assessments focused on regulatory compliance, environmental protection, and effective stormwater design, all of which address the needs of developers, government agencies, landowners, and local councils. Each of our investigations includes results from comprehensive scientific analyses and site-specific data and yields recommendations for regional stakeholders to achieve optimal environmental benefits and expedite the approval of development applications.
Wollondilly Shire has many rivers and their tributaries, including the Nepean River, and also has sensitive areas that are upstream of the downstream Water Supply catchment areas (headwaters, floodplains). Stormwater runoff from developments that do not adequately manage it will harm these systems, potentially causing serious compliance issues. Water Cycle Management Studies are necessary to demonstrate that the Water Cycle Management and any future development plans will not adversely affect either the function of stormwater runoff or the quality of Stormwater Over Time. Without this assessment, developments may:
Wollondilly prepares Water Cycle Management Studies to outline and identify water-related risks early in the design stages, enabling informed decision-making and ensuring developers that their stormwater problems will not hinder the development from obtaining all necessary approvals.
Water Cycle Management in Wollondilly will provide a comprehensive approach to managing all aspects of the water cycle. The delivery of an extensive water cycle study will involve collecting and analysing the various components of the water cycle to provide a complete understanding of how this will impact the development and compliance.
We utilise established methodologies to develop tailored water cycle management plans for each site. Each of these water cycle management plans will be based on detailed analyses of the site and will include a range of practical stormwater management solutions that meet the requirements of the local landform characteristics, catchment behaviour, and the government regulatory framework.
Our Wollondilly Water Cycle Consultant Services will provide you with the following:
In addition, each water cycle management study in Wollondilly has specific goals and objectives that address functional requirements, environmental sustainability, and regulatory compliance, while also accounting for the site's particular characteristics and constraints.
To streamline the entire environmental assessment and approval process, Harris Environmental Consulting offers a suite of services integrated into a single package. Services include Environmental Impact Assessment, Flood Planning and Drainage Assessments, Soil and Water Management Plans, Ecological and Biodiversity Assessments, and Sustainability and Environmental Management Strategies.
By utilising a coordinated approach for your Water Cycle Management Studies in Wollondilly, we eliminate the risk of duplicating services while providing consistent documentation that streamlines your progress through the Development Application process. Getting started on your Water Cycle Management Study Wollondilly early in the development process can significantly reduce the time necessary for approval and the risk of failure.
To assist with preparing your Water Cycle Management Study for Wollondilly, please contact one of our professional water cycle consultants today.
Generally, if your proposed development will change existing drainage, result in a substantial increase in impermeable surfaces or have an effect on the catchment area, you'll need to submit a Water Cycle Management Study to Council. Call us if you're unsure about your project's requirements.
It takes approximately 2 weeks to complete a Water Cycle Management Study; the time frame may vary based on your site's complexity and availability of supporting information. If your project's timing is urgent, please call us to discuss fast-tracking your project.
A site plan, proposed development layout and any available drainage/engineering data. If you do not have any of those documents, we can work with you to create your site plan and include your projected development layout.
No consultant can guarantee Council Approval. Our Water Cycle Management Studies are closely aligned with the Wollondilly Shire Council and NSW Guidelines, thereby reducing the likelihood of delays or further information requests.
Call Harris Environmental
on 02 4236 0954
to discuss your project
This Equestrian Centre with a residential dwelling and amenities for workers had been utilising a septic tank and trench, the system had failed and upgrade was needed.