Harris Environmental Consulting Logo

Contact Harris Environmental Consulting for your on-site wastewater, stormwater, erosion & sediment control or bushfire assessment needs.

02 4236 0954
info@hec.eco
  • Home
  • About Us
  • Water Cycle Management
  • Stormwater Management
  • On-Site Waste Water Management
  • Contact

Water Cycle Management Studies Razorback

Comprehensive, Council-Ready Water Cycle Assessments for Development Approvals

“Smart, affordable water cycle solutions designed to protect Razorback’s catchments and streamline council approval pathways.”

Water management is critical for the overall growth of Razorback and its surrounding countryside. Razorback is composed of elevated land, diverse soils, and sensitive waterways. It is located in an area that requires careful consideration of stormwater size and quality to prevent environmental damage and to avoid delays in planning. Development pressure will continue to increase throughout the Macarthur and Wollondilly regions. As a result, local authorities will place greater focus on developing Water Cycle Management Studies in Razorback as part of Development Applications, Subdivisions, and Infrastructure Construction. These studies will demonstrate that the impact of stormwater on each proposed development has been adequately assessed through site- and catchment-based analyses, and that all proposed developments comply with current State regulations.

Harris Environmental Consulting has been conducting Water Cycle Management Studies, Razorback and associated environmental assessments for over 20 years. Our services provide an understanding of the unique complexities of managing water in rural and semi-rural landscapes. Through comprehensive assessments, we meet all regulatory compliance requirements, protect the environment, and promote practical stormwater design to benefit our clients, developers, local councils and governmental organisations. Each of our studies undergoes a thorough scientific assessment to ensure it addresses the specific site characteristics, which supports the efficient and confident processing of development approvals.

The Importance of Water Cycle Management Studies

Razorback is located within a drainage basin that supports waterways and communities at its bottom, which are environmentally significant. The steep slopes, dispersive soils, and high frequency of rainfall events create an environment conducive to high erosion, sediment transport, and flooding unless they are appropriately designed with stormwater systems.

The Water Cycle Management Studies will identify and manage these risks in Razorback Development. Without an assessment, developments will be at risk for:

  • Uncontrolled stormwater flows cause erosion and sedimentation.
  • Increased potential for flooding downstream to other properties and infrastructure;
  • Water quality will be declining due to high levels of nutrients, pollutants, and sediment.
  • Degradation of aquatic ecosystems and riparian corridors
  • Safety hazards to people, properties and travel routes
  • Costs for redesign, delays getting approvals, and paying fines for non-compliance

Conducting Water Cycle Management studies will allow Razorback Development to identify potential water risks earlier, enabling informed design decisions and reducing the risk of stormwater issues that could delay development approval.

Our Water Cycle Management Studies for Razorback

Razorback Water Cycle Assessment offers an integrated approach to stormwater assessment. We apply an integrated approach to assess the entire cycle of water management from precipitation to runoff generation, treatment, detention, and discharge.

In addition, we use a robust methodology to develop site-specific stormwater management plans. Each plan contains a comprehensive analysis of the site and the practical application of stormwater treatment methods based on the physical and environmental characteristics of the Razorback project site.

What Our Water Cycle Consultants Provide in Razorback

As experienced water cycle consultants working in Razorback and surrounding areas, we provide a comprehensive range of services to support compliant and practical development outcomes.

Our services include:

  • Identification and assessment of site and catchment characteristics, including topography, soil types, drainage paths, and environmental constraints
  • Modelling of pre- and post-development stormwater flows, including flood behaviour and development capacity assessment
  • Design and assessment of water quality treatment systems in accordance with Water Sensitive Urban Design (WSUD) principles
  • Selection and design of appropriate stormwater control measures, such as biofiltration systems, swales, rain gardens, detention basins, and infiltration systems where suitable
  • Assessment of downstream impacts on creeks, drainage lines, and receiving waterways
  • Integration of water cycle outcomes into civil engineering designs, landscape plans, and construction staging
  • Preparation of compliance documentation aligned with local council requirements, NSW guidelines, and relevant state planning policies

Throughout the Development Application assessment process, we provide ongoing support, including responses to council requests for additional information. Each Water Cycle Management Study prepared for Razorback delivers a clear, practical, and sustainable outcome that meets regulatory obligations while responding to the site’s specific constraints and opportunities.

Start Your Water Cycle Management Study in Razorback

We offer a complete range of environmental services from the outset to facilitate a streamlined process for obtaining Council approval; this ensures minimal duplication and consistency across the Environmental Impact Assessment, Flood and Drainage Planning, Soil and Water Management Plans, Ecological and Biodiversity Assessments, and Sustainability and Environmental Management Strategies documentation.

Utilising this approach saves our clients time and reduces the overall project risk of not obtaining approval by clearly identifying and addressing potential issues from the beginning, thereby allowing your Development Applications to be processed much more quickly than through a standard, fragmented process. By implementing Water Cycle Management Studies in Razorback early in your project planning, you reduce Development Application timeframes and the likelihood of not obtaining Development Approval.

To discuss your Water Cycle Management Studies in the Razorback project and for expert assistance from concept to completion, please contact a member of our team of water cycle consultants today!

Water Cycle Management Studies in Razorback – Frequently Asked Questions

Do I have to complete a Water Cycle Management Study for my Razorback development?

Most new development that changes drainage, creates impermeable surfaces, or contribute to existing catchments will most likely require Water Cycle Management Studies in Razorback. Please call us if you wish to verify this.

How long will it take for my Water Cycle Management Study to be completed?

Most studies are completed in approximately 2 weeks, depending on the site's complexity and data availability. If you need to expedite your project, please let us know, and we will make every effort to accommodate your request.

What information do I need to begin a Water Cycle Management Study?

A site layout, proposed layout, and any available engineering and drainage information would be beneficial to start with. If this information is not yet available, we will assist you in determining what is necessary and help you through the initial stages of the process.

Can I expect that the council will approve my Water Cycle Planning Study?

No consulting firm can guarantee approval. However, through the development of our Water Cycle Management Studies in Razorback, we have ensured our full compliance with council and State guidelines, thereby minimising the chance of delays or requests for additional information.

Call Harris Environmental
on 02 4236 0954
to discuss your project

Recent Projects

Campbelltown City Council Floating Wetland Trial

Trial the use of Floating Treatment Wetlands with Bird Protection Cages

READ MORE
Angus Creek Storm Water Harvesting

Manage and improve the water quality and aesthetics of the storm water collected from Angus Creek

READ MORE
Penrith Lakes Regatta Centre

Pre treatment of storm water used in recreational waters

READ MORE
Sutton Forest Service Centre

Privately operated Sewage Treatment Plant servicing a roadside truck stop with a MacDonald’s Restaurant

READ MORE

Case Studies

Contact us

We'd love to hear from you

ABOUT US
CONTACT US
WHAT OUR CUSTOMERS SAY
linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram