Harris Environmental Consulting Logo

Contact Harris Environmental Consulting for your on-site wastewater, stormwater, erosion & sediment control or bushfire assessment needs.

02 4236 0954
info@hec.eco
  • Home
  • About Us
  • Water Cycle Management
  • Stormwater Management
  • On-Site Waste Water Management
  • Contact

Stormwater Management

We prepare Stormwater Management Plans for residential dwellings, sheds ect. The SMP is required by Council as a part of the documentation requirements for a development application. The SMP is focused on managing the quantity (volume and flow rate) of rainwater runoff from the property, primarily to prevent flooding and damage. Since new impervious surfaces like roofs and driveways increase the speed and volume of runoff, the plan usually mandates the inclusion of On-Site Detention (OSD) systems. The main goal of OSD is to ensure that the maximum stormwater discharge leaving the property does not exceed the volume or rate that occurred before development (pre-development discharge), particularly during significant rainfall events. Our civil engineer will design the size of the rainwater tank and soil absorption trenches using DRAINS to meet the specific council requirements.

Harris Environmental capabilities include:

Harris Environmental delivers practical stormwater solutions that balance development needs with environmental performance. Our team integrates hydrology, water quality, and regulatory compliance to design systems that work—on paper and on site.

What We Do 

  • Stormwater quantity: Hydrologic and hydraulic modelling, drainage layout, and On‑Site Detention (OSD) sizing to manage peak flows, protect assets, and meet council requirements.
  • Stormwater quality: Water Sensitive Urban Design (WSUD) strategy and device selection with MUSIC modelling to achieve target pollutant reductions and demonstrate a Neutral or Beneficial Effect (NorBE) where required.
  • Soil and water management: Erosion and Sediment Control (ESC) plans—from concept to construction—aligned with local guidelines to prevent off‑site impacts.
  • Wastewater interface: On‑site wastewater assessments for unsewered sites, integrated with stormwater and soil management to ensure system compatibility and compliance.

Where We Work 

From single dwellings and townhouse sites to subdivisions, commercial precincts, education facilities, and agricultural projects, we tailor stormwater solutions to scale—urban infill, greenfield release areas, and complex mixed‑use developments.

How We Deliver 

  • Early feasibility and site investigations
  • Concept design
  • Detailed modelling and engineering design
  • Council and State authority compliance documentation
  • Development Application (DA) support and post‑submission refinements
  • Construction documentation and certification


Call Harris Environmental
on 02 4236 0954
to discuss your project

Recent Projects

Angus Creek Storm Water Harvesting

Manage and improve the water quality and aesthetics of the storm water collected from Angus Creek

READ MORE
Penrith Lakes Regatta Centre

Pre treatment of storm water used in recreational waters

READ MORE
Sutton Forest Service Centre

Privately operated Sewage Treatment Plant servicing a roadside truck stop with a MacDonald’s Restaurant

READ MORE
Tuross Heads Country Club

The golf course was given unlimited access to secondary treated wastewater, but needed to make sure that stored wastewater, at a prime location within the golf course next to urban development.

READ MORE

Case Studies

Contact us

We'd love to hear from you

ABOUT US
CONTACT US
WHAT OUR CUSTOMERS SAY
linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram